A different approach to estimations in SAFe

Facebook
Twitter
LinkedIn
Pinterest
WhatsApp

SAFe™ (The Scaled Agile Framework) uses Story Points throughout the various levels as its estimation currency. This is covered in the “Story” article on the SAFe site. This is a pretty standard practice in organizations scaling agile these days. If you dive a bit deeper into how this is done in SAFe you will see that actually the story points used in SAFe are quite similar to “Ideal Developer Day” as this helps the teams align to a common baseline and support a rational economic ROI discussion at the level of Features/Capabilities that require effort from more than one team or haven’t even been mapped to a specific team yet.

An alternative to using Story Points at the team level that is interesting to look at especially as Kanban is becoming a first-class citizen of the SAFe world is to use NoEstimates.

In essence, this means not trying to estimate the size of the work just slicing work into a size that we can bite on and turn around quickly. To get a quick grasp cards-legend-non-explicit-rotated-b43a891a4ea2f2300bc84fcbee6c3bb6of it think of replacing your classic Fibonacci planning poker cards with a set of cards saying 1, TFB (Too Frighteningly Big), NFC (No Faintest Clue). This approach is rising in popularity among Kanban/ScrumBan practitioners – We’ve been looking at the “Iteration Planning” process for years trying to address some of its wastes/tensions.

This “No Estimates” inspired approach to story estimation in PI Planning has a couple of benefits:

  • It is faster – which comes in handy during PI Planning.
  • It forces teams to slice into smaller stories which is better.
  • It is naturally easier to baseline/align multiple teams around the same definition. (BTW a 1 here would be something like a 3 or 5 in the classic SAFe velocity calculation – a story that takes the team about 3 days to develop and 3 days to test)

Iteration Planning becomes even easier – Just understand your velocity and how many stories you can fit. Minimal time is spent estimating.

There are a couple of challenges though. Forcing the team to split their whole Feature into small 1-size stories including those that are only going to be pulled in later iterations in the PI might be a waste of time.

Another challenge is how to make rational economic decisions at the Feature/Capability and even Epic level without estimates. #NoEstimates die-hards say it doesn’t make sense to estimate even at this level, not just the stories level. I’m not convinced. What I typically do in cases where teams stop estimating story sizes is just use story counts as the currency at the higher levels. So instead of saying “This seems to be a 20 Story Points Feature” we would say “This Feature seems to be something around 20 stories” meaning we ESTIMATE it will map to about 20 stories when we eventually slice it. We DON’T slice it to stories in order to estimate. We reach that estimation using a classic relative estimate approach like Planning Poker / Team Estimation Game. This is actually something that helps with the first challenge as well. Knowing that we’re dealing with a Feature that we think has about 20 stories and that we identified 7 stories for the first iteration and 4 stories for the second, we might say something like there are around 9 stories more for the third iteration or even better – let’s look at the remaining chunk and compare that to our feature estimation scale and see how many stories we think there are there.

Of course, if we think there are dragons (a.k.a dependencies) hidden in this remaining chunk we should make the effort to slice it into smaller stories and work out the dependencies/scheduling with the other teams on the train.

I’ve done this with clients in the trenches. Based on this experience, I consider this alternative approach to estimation a legitimate alternative to Story Points estimation at the SAFe Team Level.

This blog post was originally posted on Yuval’s personal blog back in 2016.  

Subscribe for Email Updates:

Categories:

Tags:

Webinar
Agile for Embedded Systems
ATDD
ROI
Kaizen Workshop
Advanced Roadmaps
Agile Community
Lean Agile Organization
Agile Testing Practices
System Integration Environments
Professional Scrum Product Owner
Kanban
A Kanban System for Software Engineering
Software Development
Agile Release Management
Lean Agile Leadership
Nexus and Kanban
Agile Program
Reading List
Program Increment
Agile Outsourcing
Scrum With Kanban
Scrum Guide
Agile Basics
ATDD vs. BDD
Lean Startup
Legacy Code
SAFe
Development Value Streams
Pomodoro Technique
Agile in the Enterprise
Hybrid Work
Games and Exercises
LAB
lean agile change management
chatgpt
Daily Scrum
Entrepreneurial Operating System®
An Appreciative Retrospective
Story Slicing
Rapid RTC
Scrum Values
Sprint Planning
Scrum Master
POPM
Coaching Agile Teams
RTE
Agile Marketing
Jira Cloud
Risk-aware Product Development
Iterative Incremental Development
Team Flow
Covid19
Jira admin
Lean and Agile Principles and Practices
PI Planning
Tools
Slides
AI Artificial Intelligence
Continuous Delivery
Professional Scrum Master
AI
Planning
Video
Manage Budget Creation
GanttBan
Introduction to ATDD
Continuous Planning
Lean Agile Management
ALM Tools
Agile Release Planning
Agility
Software Development Estimation
Nexus and SAFe
WIP
LeSS
Kanban Kickstart Example
RSA
Agile Contracts Best Practices
Kaizen
Agile Product Development
agileisrael
Agile Israel Events
Operational Value Stream
Scrum
Lean and Agile Techniques
SAFe Release Planning
Agile Delivery
speed @ scale
Acceptance Test-Driven Development
Implementing SAFe
TDD
Agile and DevOps Journey
SAFe DevOps
Sprint Retrospectives
Continuous Improvement
Product Ownership
Scrum Primer
Managing Projects
Artificial Intelligence
Quality Assurance
LPM
What Is Kanban
ARTs
SA
Lean Software Development
The Kanban Method
Nexus
Lean Agile Basics
Spotify
Agile Mindset
Sprint Iteration
User stories
Agile Techniques
Systems Thinking
Built-In Quality
Scrum and XP
predictability
Business Agility
Continuous Deployment
Nexus Integration Team
RTE Role
Scaled Agile Framework
Achieve Business Agility
DevOps
Agile
Accelerate Value Delivery At Scale
AgileSparks
Frameworks
Agile Risk Management
Jira
Agile Product Ownership
Self-organization
Releases Using Lean
ScrumMaster Tales
Scrum Master Role
Enterprise DevOps
SPC
Agile Project Management
Legacy Enterprise
PI Objectives
Professional Scrum with Kanban
Effective Agile Retrospectives
Lean-Agile Budgeting
System Team
Certified SAFe
QA
Kanban Basics
Agile Israel
Value Streams
Limiting Work in Progress
Elastic Leadership
ART Success
Change Management
Continuous Integration
EOS®
Lean Risk Management
Release Train Engineer
System Archetypes
Lean-Agile Software Development
Agile Project
Code
Applying Agile Methodology
Perfection Game
Agile Exercises
Introduction to Test Driven Development
Principles of Lean-Agile Leadership
Agile India
Engineering Practices
Agile Games
Large Scale Scrum
Keith Sawyer
IT Operations
Amdocs
Kanban Game
NIT
Agile Assembly Architecture
Product Management
Agile Development
Presentation
Atlaassian
Risk Management in Kanban
Implementation of Lean and Agile
Atlassian
Tips
speed at scale
Risk Management on Agile Projects
Lean Budgeting
Certification
The Agile Coach
Kanban 101
Scrum.org
Agile Games and Exercises
BDD
Test Driven Development
Process Improvement
Portfolio for Jira
Nexus vs SAFe
Jira Plans
Lean Agile
AgileSparks
Logo
Enable registration in settings - general

Contact Us

Request for additional information and prices

AgileSparks Newsletter

Subscribe to our newsletter, and stay updated on the latest Agile news and events

This website uses Cookies to provide a better experience
Shopping cart