Limiting Work in Progress (WIP) – some anecdotes worth thinking about when using Kanban with Scrum

Facebook
Twitter
LinkedIn
Pinterest
WhatsApp

Co-Creating and teaching the new Scrum.org Professional Scrum with Kanban class has given me an opportunity to get back to geeking out on WIP limits, flow metrics, and all things Kanban. And it’s been fun!

One of the key Kanban practices is Limiting Work in Progress. If you want to be pedantic, actually what this practice aims for is Reducing and stabilizing Work in Progress. This improves flow, provides predictability, and is actually even more important for creating a pull-based Kanban system than visualizing your workflow using a Kanban board. I worked with several clients who limited their WIP but didn’t use Kanban boards. One could argue that maybe this practice deserves to be first in the list of Kanban practices, ahead of Visualization.

Anyhow, when a Scrum Team implements Kanban they should definitely figure out how to limit and reduce their Work in Progress. This is a key part of their definition of “Workflow”. First of all, when we say flow we mean flow of valuable items – so flow of PBIs (rather than tasks).

Now, a question comes up: Who should define the WIP Limit? Let’s assume the team is using Kanban to improve the Sprint flow by visualizing and managing flow in the Sprint Backlog. Sprint Backlog is owned by the Development Team so it would make sense for them to own their workflow and specifically the WIP limits in this case.

What if the team is using Kanban from a more holistic perspective, starting from the Product Backlog and including refinement work as well? In this case, it would be the Scrum Team that would own the workflow and therefore would need to discuss WIP limits.

Now, what if the Dev Team actually wants to involve the Product Owner in their Sprint flow – e.g. to review and accept a story during the Sprint before it goes through testing? Who decides whether to do this? Who owns the Sprint Backlog in this case? I think it is the Scrum Team.

Ok, so we understand who defines workflow and therefore WIP limits. Now let’s assume a team is mid-Sprint and there’s an important valuable item the Product Owner wants to add to the Sprint Backlog. It is aligned with the Sprint Goal. The team is currently at its WIP Limit. Could they add this item? Should they? What needs to happen to the WIP limit?

My take on this is that first of all a decision needs to be made on whether to pull this item into the Sprint Backlog. This discussion isn’t related to Kanban at all. It is a core Scrum question and the answer is that it is up to the team to agree to pull a new item into the Sprint Backlog. The Sprint Goal can be used to assess how aligned this item is with the current focus.

In case the item is pulled into the Sprint Backlog, then the Dev Team needs to figure out whether they can actually start it right away. This depends on the WIP limits and the current WIP. If the team is at their WIP they shouldn’t pull in that new item until some room frees up. If their backlog items are pretty small, an empty WIP slot will free up pretty quickly. If items are big, it can take a while.

The longer it might take to get a normal pull slot ready, the more pressure there might be to actually expedite this card. What is expediting? going beyond the current WIP limits and pushing this item along on top of the existing flow. The typical way to do this is NOT to change the WIP limit definition but to go above WIP and note a WIP exception. These exceptions can then be a topic for inspection and adaptation come time to retrospect.

In general, I don’t recommend changing WIP limits on a whim just because there seems to be a need during the Sprint. I’d rather see an exception and discussion rather than hide the problem under a policy change. Most of the time, Scrum Teams should adjust WIP limits during the Sprint Retrospective out of an attempt to create a better flow strategy, not a way to manage at the tactical level. This is similar to the definition of Done. We don’t change the definition of Done during a sprint just because we have a problem creating a Done Increment. We note the exception, maybe even fail to create a really Done Increment, and we discuss the definition during our Retrospective.

One last thing to note about limiting WIP is that while we typically talk about limiting WIP as per-lane constraints on your workflow, this is actually just one specific way to do it. You could limit the amount of work in progress per person, per the entire team throughout their workflow, or actually, you could limit WIP by time. E.g. “we won’t work on more than 10 items this week”. Hey – that sounds familiar! #SprintForecast.

NOTE: Updated to emphasize that we want to limit WIP by valuable PBIs (rather than tasks). Thanks, Giora for suggesting to make that explicit.

Subscribe for Email Updates:

Categories:

Tags:

Covid19
IT Operations
RTE
Portfolio for Jira
SA
Enterprise DevOps
Agile for Embedded Systems
Implementation of Lean and Agile
Release Train Engineer
Agile Project
Webinar
Tools
Agile Games
Self-organization
Scrum Values
Nexus and Kanban
speed at scale
The Kanban Method
Coaching Agile Teams
Achieve Business Agility
Engineering Practices
GanttBan
Agile Marketing
Agile Exercises
Daily Scrum
User stories
Lean Budgeting
SPC
Product Ownership
Manage Budget Creation
Kaizen Workshop
Lean Agile Organization
SAFe Release Planning
Agile Outsourcing
Tips
Agile in the Enterprise
Scrum Primer
agileisrael
NIT
Jira
Continuous Delivery
Nexus and SAFe
Planning
System Integration Environments
predictability
Spotify
Jira Plans
Agile Risk Management
Agile Release Management
LeSS
Elastic Leadership
Agile Product Ownership
ATDD
Scrum.org
Certification
POPM
Scrum Master Role
Kanban Basics
Lean Agile Management
Scrum and XP
Artificial Intelligence
EOS®
Agile Program
Managing Projects
Quality Assurance
Hybrid Work
Sprint Planning
Professional Scrum Master
Slides
Story Slicing
Development Value Streams
SAFe
Lean-Agile Budgeting
BDD
Lean Software Development
Agile Contracts Best Practices
Amdocs
AI
The Agile Coach
What Is Kanban
Continuous Integration
Lean Risk Management
Agile Israel
Agile
QA
AI Artificial Intelligence
Process Improvement
ROI
RSA
Change Management
Atlassian
LPM
Video
Agile Techniques
Sprint Retrospectives
Scrum
Risk Management on Agile Projects
System Team
Software Development
Pomodoro Technique
Kanban
Advanced Roadmaps
AgileSparks
Agile Basics
Agile Product Development
Software Development Estimation
Agile Release Planning
Large Scale Scrum
Scaled Agile Framework
Effective Agile Retrospectives
Agile Project Management
Business Agility
ScrumMaster Tales
Product Management
Lean Startup
Managing Risk on Agile Projects
ATDD vs. BDD
Agile and DevOps Journey
Agile Israel Events
Program Increment
Jira admin
Limiting Work in Progress
Kanban Kickstart Example
SAFe DevOps
Agility
Test Driven Development
Agile Development
Keith Sawyer
Agile Games and Exercises
Kanban 101
Continuous Planning
Systems Thinking
An Appreciative Retrospective
ART Success
Principles of Lean-Agile Leadership
Lean and Agile Techniques
Risk Management in Kanban
Acceptance Test-Driven Development
Professional Scrum with Kanban
Continuous Deployment
Nexus Integration Team
Atlaassian
Risk-aware Product Development
Agile Testing Practices
Introduction to ATDD
ARTs
LAB
Agile Delivery
Professional Scrum Product Owner
Reading List
Team Flow
Scrum With Kanban
Legacy Enterprise
WIP
Kanban Game
lean agile change management
Agile India
DevOps
Built-In Quality
Nexus vs SAFe
PI Objectives
Lean and Agile Principles and Practices
Agile Mindset
ALM Tools
Lean Agile Leadership
Games and Exercises
Nexus
Scrum Guide
Lean Agile
TDD
Agile Community
Scrum Master
RTE Role
Implementing SAFe
Agile Assembly Architecture
speed @ scale
Continuous Improvement
Accelerate Value Delivery At Scale
Applying Agile Methodology
Frameworks
Operational Value Stream
System Archetypes
Legacy Code
Entrepreneurial Operating System®
Releases Using Lean
PI Planning
Iterative Incremental Development
A Kanban System for Software Engineering
Code
Jira Cloud
Kaizen
Value Streams
chatgpt
Introduction to Test Driven Development
Sprint Iteration
Certified SAFe
Rapid RTC
Presentation
Perfection Game
Lean Agile Basics
AgileSparks
Logo
Enable registration in settings - general

Contact Us

Request for additional information and prices

AgileSparks Newsletter

Subscribe to our newsletter, and stay updated on the latest Agile news and events

This website uses Cookies to provide a better experience
Shopping cart